Welcome to PraiseZion



HOME |   |  DOWNLOAD APP |  OPPORTUNITIES |  SERMONS
|  JOBS |  INSTRUMENTAL | MIXTAPES |  DEVOTIONAL

SEARCH CONTENTS (Use Name Or Title)


Sanwo-Olu: Ambode Left Agege-Pen Cinema Bridge At 20% Completion

In line with our Strategic Transport Master Plan, I commissioned the 1.4km dual carriage Pen Cinema Flyover Bridge and Ramp with 5 adjoining network of roads today.

It was great to stand before Lagosians to celebrate the delivery of this landmark project, which reflects our administration’s belief in the principle of continuity in governance.

When our administration was inaugurated, this project was at about 20% completion stage.

With the delivery of this bridge, which is complemented with traffic signalisation and drainage channels, we have resolved the perennial traffic arising from huge human and vehicular movement from Agege-Pen Cinema Intersection towards Abule Egba, Fagba, Oke Koto and Iyana Ipaja.

With the delivery of this bridge, which is complemented with traffic signalisation and drainage channels, we have resolved the perennial traffic arising from huge human and vehicular movement from Agege-Pen Cinema Intersection towards Abule Egba, Fagba, Oke Koto and Iyana Ipaja.— Babajide Sanwo-Olu (@jidesanwoolu) March 5, 2021

| Categories: News

CLICK HERE TO COMMENT ON THIS POST

WE ARE ON SOCIAL MEDIA

Facebook | Twitter | Instagram | Youtube

0 Comments

LEAVE A COMMENT

Type Name Below

Type Comment Below

« | »